Auditorium-Art-Complex-Cathedral-High-School-The-Conco-Companies.jpg

Location: 1253 N. Bushops Rd. Los Angeles
General Contractor: Bayley Construction
Architect: JP. Darling
Structural Engineer: STB Structural Engineers, INC
Project Size: 28,000 Sqft Auditorium, Classroom and Parking Building

The Conco Companies is contributing various concrete services to the Arts Complex building at Cathedral High School in Los Angeles. The 350-seat theater will provide the opportunity for students to further explore and develop their interests in the arts before college. The new auditorium features an exposed concrete thrust stage, a type of stage the extends into the audience with seating around three sides of the stage. This unique design required careful planning and precise execution to create the stage and surrounding seatings’ flooring. Conco worked to carefully plan the dimensions of the areas onsite and execution of the different stages in setting, pouring and perfecting the concrete of these fundamental pieces of the auditorium.

Conco began working on the project in September 2017 and responsibilities include providing concrete formwork, concrete pumping, concrete finishing and shotcrete services for the project. Conco was selected for this project among a select groups of contractors due to their vast array of concrete services, particularly formwork, pumping, shotcrete as well as cast in place vertical and horizontal concrete construction. With difficult project constraints such as a compact construction site next to the school’s playing fields that make planning and on-time execution essential, Conco’s vast experience and concrete services made them the leading candidate for the project. Conco’s work on the project is expected to be completed in April 2018.

Read more about Arts Complex @ Cathedral High


Milpitas-750-The-Conco-Companies.jpg

The Conco Companies is providing a full range of concrete services on the Milpitas 750 Project for the Foster City based owner/developer, the Anton Development Company. The project is a 7-Level parking garage totaling 189,475 sq. ft. and will provide parking for 508 vehicles. This project is located at the corner of E. Capitol Ave and Montague Expressway.

Conco’s responsibilities include providing concrete pumping, reinforcement, formwork, finishing, and shotcrete services.  During the project we expect to place 10,300 cubic yards of concrete as well as shotcrete.   We are also providing 1,600,000 pounds of rebar and post tension reinforcement.  Our crews began the project in September of 2017 and will complete the job in August of 2018.

Read more about Milpitas 750


221-North-Matilda-The-Conco-Companies.jpg

The Conco Companies is providing a full range of concrete services on the 221 N. Mathilda Project for the San Francisco based owner/developer Spear Street Capital.   The three-story, Class A office building also has a partial below grade parking structure with parking stalls. The project is on a 4.3 acre greenfield site located between N. Market Ave and Sobrante Way just off W. California Ave and close to the Sunnyvale Caltrain station, the San Francisco Peninsula commuter rail service.   The building’s architect, SmithGroupJJR says the most significant design feature is the “striking, custom 2,000 sq. ft., laminated glass artwork that will span the building’s east façade.” 

Conco’s responsibilities on the project include providing concrete pumping, reinforcement, formwork, finishing, and shotcrete services.  During the project, we expect to place 7,600 cubic yards of concrete as well as shotcrete.  This project consists of 1,150,000 pounds of rebar and post tension reinforcement of which Conco is having placed by others due to factors beyond our control.  We started the project in August 2017 will complete the job in July 2018.  

Read more about 221 N. Mathilda 


Santa-Clara-Square-The-Conco-Companies.jpg

The Conco Companies is providing a full range of concrete services on Phase II of the Santa Clara Square Project (Buildings 3-5) for the Newport Beach based owner/developer, the Irvine Company.  The entire project consists of 1,763 residential units within 7 separate, 5-story buildings, all wrapped with concrete garage structures and a central promenade that  includes approximately 40,000 square feet of ground-floor retail.

Conco was awarded Phase II of the project which is 3 of the 7 buildings (861 of the residential units) and wrapped parking structures for a total of 642,886 sq. ft.  The Santa Square Buildings are located between Scott Blvd & Augustine Drive from Octavius Drive to Main Street in Santa Clara, CA. 

Conco’s responsibilities on this project include providing concrete pumping, reinforcement, formwork, finishing, and shotcrete services.  For the project, we expect to place 22,700 cubic yards of concrete as well as shotcrete. We are also providing 3,100,000 pounds of rebar and post tension reinforcement.  Conco crews began work on the project in October 2017 and we will finish up our end of the project in August 2018.  The complex expects to receive LEED Gold certification for its environmental sustainability. 

Read more here: Santa Clara Square Project Buildings 3-5 Phase II


Stanford-Redwood-City-A3-Building-The-Conco-Companies-g.jpg

The Conco Companies is providing a full range of concrete services on the Stanford Redwood City A3 Building Project for the Palo Alto based owner/developer, Stanford University Land, Buildings, & Real Estate.  The 2-story concrete and steel fitness center is a part of the Stanford Redwood City campus.  Located on 35-acres, the Redwood City campus is located between Broadway and Bay Road with the A3 building backing up to Second Ave.   In addition, we have been providing concrete services for the Stanford Redwood City Parking Garage Project that is located in the same area.  

Conco’s responsibilities on the project include providing concrete pumping, reinforcement, formwork, finishing, and shotcrete services.  For the project, we placed approximately 2,800 cubic yards of concrete as well as shotcrete.   We also provided 330,000 pounds of rebar and post tension reinforcement.  Conco’s crews began work on the fitness center in May of 2016 and completed work in October of 2017.

Read more about Stanford Redwood City A3 Building


Conco Locations West Coast

DIRECT LINES

The Conco Companies

Conco Headquarters

(800) 695-6799

Pumping

(800) 347-3407

Confoam™

(866) 347-3407


EMAIL

Send A Message

Use our online form to send us a secure message.

CONTACT US

GET IN TOUCH

Follow Our Activity

See how Conco is transforming communities with technology and innovation while delivering premium concrete services.


Northern California


(925) 685-6799

5141 Commercial Circle

Concord, CA 94520

Southern California


(909) 350-0474

13052 Dahlia Street

Fontana, CA 92337

Oregon


(971) 808-5954

7025 N Leadbetter Road

Portland, OR 97203

Washington


(425) 251-1684

18644 72nd Avenue S

Kent, WA 98032

Skip to content