Office building with parking.
Office building with parking.
Located at 2200 John Muir Parkway in Hercules, CA, is the Hercules Block Q&R project. This project will be home to 232 new apartment units and over 300 available parking spaces. Additionally, residential space will be surrounded by two fully landscaped courtyards to both the north and south.
The Conco Companies anticipates placing over 13,400 cubic yards of concrete, in addition to shotcrete and Confoam. Conco will also be responsible for providing 3,000,000 pounds of rebar and post tension reinforcement.
A new two-story mixed-use building that will feature 37 luxury condominium units, commercial retail space on the first floor (street level) and a subterranean garage with 79 parking spaces. Structure consists of footings, slab on grade, columns, shotcrete walls, and elevated podium slab.
Laguna Clara II | Palisade Builders, Inc. | 3131 Homestead Road, Santa Clara, CA |
This four-story medical office building in Pasadena will also contain 3 levels of subterranean parking. The structure will be comprised of structural slabs up to ground level, as well as metal deck slabs and a steel structure above.
VE & ConFoam
As part of our VE efforts, Conco eliminated the gravel beneath the SOG and will utilize the excavated and recompacted native material, as was consistent with allowable methods identified by the soils report. This not only produced a substantial savings to the project owner, but also eliminated the need to off-haul and dispose of hundreds of yards of useful soil.
In addition, deep sewer ejector and sump pits had massive footprints for their benched excavations. We elected to use ConFoam to backfill around these pits, which produced a substantial time savings to the operation as well as allowed for simple future utility installations within the footprint.
Conco Headquarters
Pumping
Confoam™