Conco is assisting with the redevelopment of the UC Davis Orchard Park Student Housing Project, located between Russell Blvd and Orchard Park Drive. Originally built in 1964, Orchard Park provided students with families housing. In 2015, the facility was closed for redevelopment. Currently in construction, Orchard Park is expected to reopen to residents in September 2023.
The full student housing project consists of 11 residential buildings, which include graduate student commons, family commons, a mail & package delivery center, and a maintenance building. The residential buildings are 4-story with slab on grade, and all other ancillary buildings are designed to be 1-story.
Conco’s role is to provide complete concrete services including concrete pumping, concrete reinforcement, concrete formwork, concrete finishing, and shotcrete. We expect to place 8,300 cubic yards of concrete and shotcrete, and 700,000 pounds of reinforcing bar. We’re proud to contribute to a project that will increase affordability of student housing, enhance resident life, and provide exceptional residential operations.