Santa-Clara-Square-The-Conco-Companies.jpg

The Conco Companies is providing a full range of concrete services on Phase II of the Santa Clara Square Project (Buildings 3-5) for the Newport Beach based owner/developer, the Irvine Company.  The entire project consists of 1,763 residential units within 7 separate, 5-story buildings, all wrapped with concrete garage structures and a central promenade that  includes approximately 40,000 square feet of ground-floor retail.

Conco was awarded Phase II of the project which is 3 of the 7 buildings (861 of the residential units) and wrapped parking structures for a total of 642,886 sq. ft.  The Santa Square Buildings are located between Scott Blvd & Augustine Drive from Octavius Drive to Main Street in Santa Clara, CA. 

Conco’s responsibilities on this project include providing concrete pumping, reinforcement, formwork, finishing, and shotcrete services.  For the project, we expect to place 22,700 cubic yards of concrete as well as shotcrete. We are also providing 3,100,000 pounds of rebar and post tension reinforcement.  Conco crews began work on the project in October 2017 and we will finish up our end of the project in August 2018.  The complex expects to receive LEED Gold certification for its environmental sustainability. 

Read more here: Santa Clara Square Project Buildings 3-5 Phase II


Modera-at-San-Pedro-The-Conco-Companies.jpg

The Conco Companies is providing a full range of concrete services on the Modera at San Pedro project located within downtown San Jose’s historic San Pedro Square for the San Mateo based owner/developer, Mill Creek Advisors.  The mixed-use development features 201 studio, 1- and 2-bedroom luxury, residential apartment homes and 12,000 sq. ft. of commercial and retail space.  In addition, the 8-story structure also has two below grade levels and an integrated four-story parking garage to accommodate 278 vehicles.  The project is located between Almaden Avenue and San Pedro Street, north of Santa Clara Street. 

Conco’s responsibilities on the project include providing concrete pumping, reinforcement, formwork, finishing, and shotcrete services. During the project we expect to place 12,500 cubic yards of concrete as well as shotcrete and will provide approximately 625,000 pounds of rebar and post tension reinforcement (due to circumstances another company placed the reinforcement).   We began work on the Modera at San Pedro in July 2017 and finished our end of the project in February 2018.

Read more about Modera @ San Pedro


701-3rd-Street-The-Conco-Companies.jpg

The Conco Companies is providing a full range of concrete services for a new 11-story hotel currently under construction in downtown San Francisco.  Located near AT&T Park, the 701 3rd Street Hyatt Place project is a 230-room hotel that is being developed by the Stonebridge Corp., a Colorado hotel development firm.  The project is expected to receive LEED Platinum certification for features that include vegetated roofs, a grey water system, and highly sustainable mechanical systems.  The building will have a public courtyard at ground level and a terrace and rooftop deck at the 9th and 12th level for hotel guests. Since the majority of recent construction within the city has been office buildings and apartment towers, hotels are in high demand and a new hotel development is welcomed.

Conco began work on the project in May of 2017 and will be finished in January, 2018. Our responsibilities included providing concrete reinforcement, pumping, formwork, finishing, shotcrete and construction trucking as well as Design/Build services.  Conco was selected for the job due to our understanding and commitment to the project and our longstanding relationship with the general contractor, Charles Pankow Builders.  The project had challenges along the way due to the logistics of its location near AT&T Park as well as its aggressive schedule, and we are proud to report that we will meet all of them.

Read more about 701 3rd Street – Hyatt Place here.


700-Santana-Row-The-Conco-Companies.jpg

Location:   San Jose, CA
Developer/Owner:  Federal Realty Investment Trust
Architect:  WRNS Studio
General Contractor:  Devcon Construction Inc.
Structural Engineer:  Nishikian Menniger
Total Project Size: 457,100 SQ. FT.

The Conco Companies is currently providing a range of concrete services for 700 Santana Row, an eight-story, 292,000 sq. ft. Class-A office building in Silicon Valley that is scheduled to be ready for tenants by the fall of 2018.  The distinctive and modern concrete structure is located in the Santana Row mixed-use center and will cost an estimated $205 million to $215 million.  The project also includes a new six-level parking garage with one level below-grade and five levels above for a total of 1,300 spaces.  Four levels are to be reserved for office tenants during normal weekday office hours and the other two levels will always be available to the general public.  In addition to the office space there will be 28,500 sq. ft. of retail space.

Conco started work on the project in June 2017 and we expect to have our part of the job finished by May, 2018.  For our part of the project, Conco is providing concrete pumping, reinforcement, formwork, shotcrete, finishing and construction trucking services.  Furthermore, our expertise includes providing Design/Build solutions for the project.

Read more about the 700 Santana Row project here.


modera-glisan_main-exterior-The-Conco-Companies.jpg

Location: Portland, OR
Development Company: Mill Creek Residential Trust
General Contractor: MCRT PNW Construction, LLC
Architect: SERA Design and Architecture, Inc.
Structural Engineer: KPFF
Project Size:  335,000 SF elevated deck

The Conco Companies is providing a full range of concrete services on a 12-story, 145-foot tall mixed-use building in Portland, OR.  Conco duties will include concrete pumping, reinforcement, formwork, finishing, shotcrete, formwork, and construction trucking.  As the job requires an aggressive schedule, we will need to use multiple placing booms.

The Modera Glisan will offer 291 residential units on the upper floors and retail and commercial space at ground level that will face all four adjacent streets. In addition the Modera Glisan will have an underground parking garage with an estimated 223 parking spots as well as long term parking for 445 bicycles.  Materials for the exterior will include granite colored brick, metal panel in two colors, an aluminum storefront, and glass balcony railings.

In addition to the Modera Glisan, Conco has just started another high-rise project directly across the street called 14th & Glisan that is being developed by the Holland Partner Group.

 

 


Conco Locations West Coast

DIRECT LINES

The Conco Companies

Conco Headquarters

(800) 695-6799

Pumping

(800) 347-3407

Confoam™

(866) 347-3407


EMAIL

Send A Message

Use our online form to send us a secure message.

CONTACT US

GET IN TOUCH

Follow Our Activity

See how Conco is transforming communities with technology and innovation while delivering premium concrete services.


Northern California


(925) 685-6799

5141 Commercial Circle

Concord, CA 94520

Southern California


(909) 350-0474

13052 Dahlia Street

Fontana, CA 92337

Oregon


(971) 808-5954

7025 N Leadbetter Road

Portland, OR 97203

Washington


(425) 251-1684

18644 72nd Avenue S

Kent, WA 98032

Skip to content