Main Street Gateway Project
The Conco Companies were awarded the complete turn-key structural concrete package for The Main Street Gateway, a mixed-use project in downtown Bellevue, WA. Conco brings extensive experience to the project and will provide the pumping, place and finish, shotcrete, and formwork along with supplying the reinforcement. We recently poured the structural slabs in early July. Cadman Inc. is supplying all of the ready-mix for us, and the reinforcing will be installed by RPM. The project is scheduled for completion in summer 2016.
Once complete, The Main Street Gateway, a venture from the Wolff Co., will have about 350 residential units along with the associated community spaces. At street level, the building will offer approximately 14,600 sq. ft. of retail space and 11,000 sq. ft. of restaurant space. The project includes underground parking for about 600 vehicles and will also have several electric vehicle charging stalls. In addition there will be secure bicycle storage slots.
Read more about Main Street Gateway
Details
Location: Bellevue, WA
Summer 2016
General Contractor:
Exxel Pacific
Architect:
Baylis Architects