The Stadium Tech Center Project
The Conco Companies are currently providing concrete services for the new 6-story Stadium Tech Center, in Santa Clara, CA. Located in the heart of Silicon Valley, the speculative Class A office building broke ground in March, 2014 and is expected to be completed in October, 2015. Spear Street Capital, the San Francisco-based real estate investment company is developing the property and ARC TEC is the architect. The South Bay Construction Company is the general contractor.
As a part of the project, Conco is constructing the parking structure, which will have one level of podium parking and 3 levels below grade for a total of 1,084 parking stalls. In addition we will provide 442,165 square feet of cast-in-place slabs, 169,014 square feet of slab-on-metal deck, and 35,054 cubic yards of concrete. Floors will have a slab-to-slab height of 14′ – 16′.
The new Center will incorporate cutting edge architectural details and feature 35,000 – 38,000 sq. ft. floor plates and a flexible open plan with 226,500 sq. ft. of column free space. Also the building’s floor to ceiling glass will offer 360 degree views. The energy-efficient design is prequalified for LEED certification.
Located on a 12.35 acre site, the Center has direct access off Highway 237 and is just a short walking distance from the new 49ers Levi Stadium and Joe Montana’s “Centennial Gateway” luxury hotel and entertainment complex. Highlights of the building include a state-of-the-art lifestyle fitness center and café as well as full access to the existing campus amenities such as a full-service cafeteria, bocce ball court, outdoor recreational areas and jogging trail.
We are a leading supplier of concrete services for the Western U.S. and got our start in the Bay Area in 1959 by offering clients the best value on a wide range of concrete services and products. Since that time, we have taken a leading role as one of the top concrete contractors in the region. We currently serve California, Washington, Oregon, Nevada and Colorado.